• UndercoverUlrikHD@programming.dev
    link
    fedilink
    English
    arrow-up
    1
    ·
    9 months ago

    However, in examining the role of SMRs, the EAC heard that a final investment decision on the first station in the UK is not expected until 2029. The timeline means it is unlikely to contribute to the 2035 target, or Labour’s pledge to run the grid on clean energy by 2030.

    That argument is so old that you could have built three generations in that time. If you never start, it will allways be late.